The flightline before the rubber removal process (left), and the flightline after (right). The 92nd Civil Engineer Squadron snow barn team gathered with the 92nd CES fire department to conduct rubber removal on more than 4,000 feet of Fairchild’s flightline, Oct. 4, 2013, at Fairchild Air Force Base, Wash. (U.S. Air Force photo/Staff Sgt. Veronica Montes)