LRS building consolidated after teardown
The old 92nd Logistics Readiness vehicle operations building is torn down to reduce utility and maintenance cost, April 5, 2017 at Fairchild Air Force Base Wash. The total period of teardown and removal of all debris will take 365 days and includes design, physical and closeout parts. (U.S. Air Force photo/Senior Airman Mackenzie K. Richardson)